Схемы
|
Tram network during winter 2023/2024.
Декабрь 2023 г. Автор: Karalis Arturs
|
|
On 23rd August 2023 Metropolitano de Lisboa announced the extension of the Red line to Alcântara with four new stops (Campolide/Amoreiras, Campo de Ourique, Infante Santo and Alcântara). The construction of this extension should be completed in 2026.
2023 г. Автор: Karalis Arturs
|
|
Lisbon metro network diagram from 2023
(Blue line extension to Reboleira (completed in 2016) and Green line extension to Rato under construction)
2023 г. Автор: Karalis Arturs
|
|
Схема по состоянию на 07.2018
12 июля 2018 г. Автор: Palal
|
|
Lisbon Metro network diagram including proposed expansion from 2017.
As of March 2024 the only not yet approved expansion is for yellow line from Telheiras to Benfica. All other expansion have been approved or are already under construction.
2017 г. (примерно) Автор: Karalis Arturs
|
|
Схема метро по состоянию на 2016-04-13
13 апреля 2016 г. Автор: Palal
|
|
Схема трамвайных маршрутов
Март 2012 г. Автор: Palal
|
|
Фотка 2011 года, частичная схема метро сегодняшняя
26 февраля 2012 г. Автор: Palal
|
|
Lisbon metro network diagram from 2012
(Red line extension to Aeroporto)
2012 г. Автор: Karalis Arturs
|
|
Схема трамвайных маршрутов
Февраль 2011 г. Автор: Palal
|
|
Lisbon metro network diagram from 2009
(Red line extension to São Sebastião)
2009 г. Автор: Karalis Arturs
|
|
Lisbon metro network diagram from 2007
(Blue line extension to Santa Apolónia)
2007 г. Автор: Karalis Arturs
|
|
Lisbon Metro network diagram including proposed expansion from 2005
2005 г. (примерно) Автор: Karalis Arturs
|
|
Lisbon metro network diagram from 2004
(Yellow line extension to Odivelas and Blue line extension to Amadora Este)
2004 г. Автор: Karalis Arturs
|
|
Lisbon metro network diagram from 2003
(Green line extension to Telheiras)
2003 г. Автор: Karalis Arturs
|
|
Lisbon metro network diagram from 1998 with new logo
(Introduction of Green and Red Lines, Green line extension to Cais do Sodré and Blue line extension to Baixa-Chiado)
1998 г. Автор: Karalis Arturs
|
|
Lisbon metro network diagram from 1997
(Yellow line extension to Rato and Blue line extension to Pontinha)
1997 г. Автор: Karalis Arturs
|
|
Lisbon metro network diagram from 1995
(Introduction of Yellow line)
1995 г. Автор: Karalis Arturs
|
|
Lisbon metro network diagram from 1993
(Connection from Cidade Universitária to Alvalade over Campo Grande)
1993 г. Автор: Karalis Arturs
|
|
Lisbon metro network diagram from 1988
(Extensions to Colégio Militar/Luz and Cidade Universitária)
1988 г. Автор: Karalis Arturs
|
|
Lisbon metro network diagram from 1972
(Extension to Alvalade)
1972 г. Автор: Karalis Arturs
|
|
Lisbon metro network diagram from 1963
(Extension to Anjos)
1966 г. Автор: Karalis Arturs
|
|
Lisbon metro network diagram from 1963
(Extension to Rossio)
1963 г. Автор: Karalis Arturs
|
Показано изображений: 30 из 34
Фотографии отсортированы по дате съёмки, вверху самые новые.
|